Reports

Last updated: Apr 17, 2026
Note Reports in Veeva Basics are curated by the Veeva Basics team, and cannot be created from scratch. If you would like to submit a request for a specific report, use this form.

Reports

Reports can be accessed by navigating to LIMS > Reports & Dashboards > Reports.

NameDescription
Active User ReportLists Active users by last login time stamp with the people who logged in least recently listed first so a decision can be made to potentially inactivate users.
Approved Batches by Material and StatusLists approved Batches grouped by Material. (For Release Testing)
Batches with no SpecificationLists spec execution records with no specification (spec data). These records will need to be cancelled or sent for spec data assignment. (For Release Testing)
In Progress BatchesLists batches which are in progress and provides batch details such as material, manufacture date, and due date. (For Release Testing)
In Progress Spec ExecutionsLists spec executions which are in progress and provides details such as material, manufacture date, and CoA comment. (For Release Testing)
In Progress Stability Studies by MaterialLists in progress stability studies by material.
Non Conforming TestsThis report first prompts the user to enter a spec execution creation date range, as well as a material (both filters are optional).

It then returns corresponding non-conforming tests and results.
Open Batches by MaterialLists open batches (spec executions) grouped by material. (For Release Testing)
Open Stability ReportsLists stability reports that have not been approved/fizalized.
Open Stability Samples with no Pull DetailsLists non finalized (i.e., not approved, rejected, or cancelled) stability samples with no pull dates.
Open Stability Studies with Inactive OwnersLists non completed/non cancelled stability studies with inactive owners.
Overdue Lab SamplesLists Samples which are overdue and do not have all test results entered. (For Release Testing)
Results Report with Sample and Spec Ex DetailsThis report first prompts the user to select material(s), studies, test definition(s), and spec execution(s) (all filters are optional).

It then returns valid test results and details such as formatted result, unformatted/raw result, unit of measure, testing lab, date entered, and sample and spec execution details.
Samples due within a WeekLists samples which are coming due in the next week and do not have all test results entered. (For Release Testing)
Spec Executions Ready for ReviewLists spec execution records which need to be sent for review/approval. (For Release Testing)
Stability Samples Pending ResultsLists stability samples pending results.
Stability Study and Associated Spec DataThis report allows the user to specify a stability study and see all of the associated Spec Data Criteria (limits). This allows the user to review criteria/limits across timepoint records.
Stability Timepoints Ready for ReviewLists stability timepoints (stability spec executions) ready for review.
Studies to be InitiatedLists stability studies that are ready to be initiated.
Test ConformityLists all valid tests with details such as test definition, spec execution, and sample. (For Release Testing)
Test with RetestsLists any non cancelled tests which have been retested or are a retest.
Upcoming Stability Timepoints (by month)Lists the stability timepoints scheduled in the next 3 months.
Upcoming Stability Timepoints (flash report)Flash report that runs once a week and will send an email to all LIMS users if there are any pending timepoints with an Earliest pull date within the next 2 weeks.

Dashboards

Dashboards can be accessed by navigating to LIMS > Reports & Dashboards > Dashboards.

NameDescription
Release TestingDisplays release testing metrics and reports such as in progress batches by material, samples coming due and samples due in a week, and batches ready for review.
StabilityDisplays stability testing metrics and reports such as upcoming pulls, studies to be initiated, timpepoints ready for review, samples with no results after 2 weeks.